8(a) IT firm wins first prime on a DoD modernization IDIQ
A 40-person 8(a) firm with strong sub past performance but no prime wins needed to cross the line from subcontractor to prime.
The challenge
Strong technical team, but proposals read like resumes. No win themes, no discriminators, and pricing set by gut feel. Two prior prime bids were rated "Acceptable" and lost on best value.
What we did
- Ran a 9-month capture plan with customer engagement, competitor black-hat and teaming strategy
- Built evaluator-facing win themes tied directly to Section M factors
- Developed a price-to-win model that kept the bid competitive without stripping labor quality
- Executed Pink, Red and Gold Team reviews with former DoD evaluators
The result
Facing a similar pursuit?
Get a free 30-minute bid review with a senior consultant.
Related Wins
Construction contractor lands a USACE MATOC seat
A HUBZone construction firm kept losing MATOC competitions on technical approach despite excellent field performance.
Read case study →WOSB consultancy secures GSA MAS award after two rejections
A woman-owned management consultancy had two GSA MAS offers returned and was close to giving up on the schedule.
Read case study →Logistics incumbent retains recompete with price-to-win strategy
An incumbent faced aggressive low-price challengers on a best-value tradeoff recompete.
Read case study →